Drawing freeze
Name the 2D/3D revision and file format. Unfrozen CAD for a 0.500 in land produces quotes that cannot sit on one sheet later.
FREE sourcing support for qualified business buyers, with an eligible benefit of up to 3%. Eligibility applies to qualified business buyers and is confirmed after we review your product, quantity, destination, and sourcing requirements.
RFQ ALIGNMENT
A custom reamer purchase for a hydraulic-block shop finishing 0.500 in bores collapses when one bidder prices a chucking reamer in a rigid collet, another prices a floating-holder setup, and a third skips the cylindricity after ream report. This desk writes those missing lines so factories answer the same revision, quantity, and destination.
See inquiry families
Name the 2D/3D revision and file format. Unfrozen CAD for a 0.500 in land produces quotes that cannot sit on one sheet later.
State chucking reamer versus floating holder, plus bushing or collet standard. Mixing the two setups on one custom reamer RFQ hides runout and cylindricity risk.
Call out the 0.500 in functional land, runout, and cylindricity after ream. Tight-tolerance cost rises when every chamfer is treated as ±0.005 mm.
Ra 0.4 μm versus Ra 1.6 μm, PVD/DLC, or edge hone change both price and CMM time. Ask whether coating sits inside piece price or on an NRE line.
Separate prototype pieces, first production lot, and EAU. MOQ and NRE should sit on their own lines, not inside a blended dozen.
Request CoC, material certificate, FAI, or CMM format for cylindricity. ISO 9001 remains a factory document until a copy is returned.
The table is a buyer checklist for a custom reamer used on hydraulic 0.500 in lands. It does not publish this desk’s own factory prices or a saving percentage.
| Topic | Must appear on each quote | Leave open until evidence returns |
|---|---|---|
| Geometry | 0.500 in finished diameter, flute count, shank, holder type | Unstated grind stock or rework allowance after float |
| Material | Carbide grade, HSS, or PCD system | Substitute grade without written approval |
| Inspection | Cylindricity after ream, FAI or lot plan, report format | Cpk or DPPM claims without data |
| Commercial | Currency, quantity, validity, Incoterm | Lead time that is not tied to blank availability |
| Logistics | Hydraulic-block plant destination, packing, freight basis | Duty and brokerage if DDP was not requested |
These are prompts, not downloadable factory catalogs. No file is issued as proof of capacity.
List exclusions you already know: coating, floating-holder bushing, special packaging, or on-machine tryout at the hydraulic-block cell. Factories can then price the same remainder.